261 projects, 43 counties, 73.8 GW in the current queue. Circles are counties, sized by proposed capacity and coloured by dominant fuel.
System layers
Capacity and dominant fuel
Visible
Generation queue43 county aggregates
California countiesOfficial boundaries
Legend
BatterySolarWind TurbineGeothermalWater
Circle size is proposed capacity on a log-like scale.
Coverage
Projects represented261
Counties with queued projects43
261 projects43 counties73.8 GW current queueProjects aggregated to county centre
As at 23 Nov 2026261 projects · 73.8 GW
Evidence inspector
Select a county
Choose a county circle to inspect queue capacity, project count, dominant fuel and source precision.
Largest current footprints
KERN County11.17 GW
LOS ANGELES County6.89 GW
RIVERSIDE County6.03 GW
FRESNO County4.88 GW
CLARK County4.70 GW
LA PAZ County4.55 GW
Map contract
Exact project sites, customer locations and transmission corridors are not inferred. Missing geometry stays missing and is counted in the coverage ledger.
In this interim final rule (IFR), the Department of Commerce is establishing new rules to prevent certain foreign actors from leveraging advanced computing power based on U.S. technology to threaten U.S. national security and foreign policy interests. First, this rule establishes new restrictions which will apply for exports, reexports, or transfers (in-country) to overseas data centers that remotely supply significant volumes of compute to companies headquartered in Country Group D:5 or Macau.
The County of Tulare is extending Uncodified Urgency Interim Ordinance No. 3669, which establishes a temporary moratorium on new data center development in the unincorporated areas of Tulare County. The extension will continue the moratorium for an additional ten (10) months and fifteen (15) days, through August 6, 2027. During the moratorium, the County will continue to evaluate data center development and develop comprehensive land use regulations addressing potential impacts and appropriate d
The City Council of the City of Palm Springs to adopt an ordinance to extend Interim Urgency Ordinance (Ordinance No. 2134) temporarily prohibiting the approval of applications and permits related to data centers for an additional period of twenty-two (22) months and fifteen (15) days. Interim Urgency Ordinance No. 2134 was adopted by the City Council on August 26, 2026.
Ordinance No. 821 is a City-initiated proposed code amendment to the Irwindale Municipal Code relative to adding Chapter 17.42 – Artificial Intelligence (AI) Data Centers and Associated Uses to Title 17 (Zoning) to prohibit AI Data Center Land Uses Citywide.
The Bay Area Air Quality Management District (Air District) has issued an Authority to Construct to Microsoft for eighty-four (84) backup natural gas engine generators, each abated by a 3-way catalyst system, at the San Jose Data Center. The Data Center would consist of two single-story buildings. The northern building is approximately 244,676 square feet in size, and the southern building is approximately 152,283 square feet, for a total of approximately 396,914 square feet. The maximum total d
GIC Vernon LLC is applying to the California Energy Commission (CEC) for a Small Power Plant Exemption (SPPE) for the Vernon Backup Generating Facility (VBGF), a 99 MW emergency only power system that will support the Goodman Energy Park (GEP) data center in the City of Vernon. The GEP consists of two data center buildings located near Vernon Avenue and Soto Street, with addresses at 3163 and 3049 East Vernon Avenue. The project includes forty (40) diesel generators with thirty eight (38) 3 MW u
The County of Riverside has been under lease at 1960 Chicago Avenue, Building F, Riverside, since December 16, 2013 (Lease), on behalf of RCIT for use as a data center. This 23,477 square-foot office facility continues to meet the needs for RCIT. The County has requested the lease be extended for five years, commencing December 16, 2028, under a First Amendment to the Lease. The approval of the Second Amendment to the Lease is identified as the proposed project under the California Environmenta
The California Energy Commission Project would involve the construction and operation of an
approximately 396,914 gross square foot data center facility with a maximum electrical load of 99 MW on a 64.5-acre undeveloped site at 1657 Alviso-Milpitas Road in San Jose. In addition, the Modified project would include the following supporting infrastructure improvements west of the data center site:
• Extension of McCarthy Lane by approximately 1,150 feet to act as the primary access roadway to
th
The Northtown Backup Generating Facility (NTBGF) would consist of a total of forty two (42) diesel-fired generators that would be used exclusively to provide up to 97.3 megawatts (mw) of backup emergency generation to support Northtown Data Center (NTDC) to provide uninterrupted power for its tenants servers. The proposed project site is at the southwest corner of the intersection of West Trimble Road and Orchard Parkway in San José, California. The data center buildings, emergency backup genera
Notice of Exemption for a Special Use Permit to allow a data center use within an existing approximately 97,800-square-foot research and development building on an approximately 4.86gross-acre site located at 300 Holger Way
In this final rule, the Bureau of Industry and Security (BIS) amends the Export Administration Regulations (EAR) to provide enhanced favorable treatment for the United Arab Emirates (UAE). Specifically, BIS is removing the UAE from Country Groups D:3 and D:4 and adding the UAE to Country Group A:5. More license exceptions will now be available, including Strategic Trade Authorization (STA) for the UAE Government and approved commercial entities in the UAE. STA will authorize the export, reexport