Wise County, TX data center site data

Time to power, land, grid capacity, and risk for Wise County, with a source and date for every figure.

Site summary

Wise County time to power and site score

An estimated time-to-power band and a weighted site score summarize the county’s power access, queue readiness, gas access, land, and hazards.

Estimated time-to-power band
2–4 yrs
Readiness
In study: screening complete, full interconnection study open

Top risks

  1. Most queued capacity here is speculative: under a third has a completed study.
  2. Top natural hazards (FEMA NRI): wildfire, hail, heat wave.
Estimated site score, weighted
72/ 100
  • 35%Power access: 96 · max 345 kV substation; 4.2 km to a 115 kV+ line
  • 20%Queue readiness: 20 · 19.9% of queued MW has a completed study
  • 15%Gas access: 91 · 4.4 km to a gas pipeline
  • 15%Land available: 97 · 3.4% protected or public land
  • 15%Hazard: 41 · FEMA risk index 59.0
Power

Wise County grid capacity and interconnection queue

Generation queued and operating in the county, transmission and gas access, power prices, and the TX-wide demand that new large loads compete with.

Generation and storage queue
3,798MW
Studied share of queue
756MW
19.9% of queued MW — derived from ISO status
Large-load queue (ERCOT, state total)
466.5GW
ercotqueue.com, ERCOT large-load funnel · Jun 18, 2026 · CC BY 4.0 · ERCOT publishes large loads for Texas as a whole; no public source names the county
Operating generation
4,474MW
Transmission substations
3substations
HIFLD, transmission lines and substations · Nov 1, 2026 · Public domain · max 345 kV
Distance to 115 kV+ line
4.2km
HIFLD, transmission lines and substations · Nov 1, 2026 · Public domain · from county centre
Distance to gas pipeline
4.4km
EIA, natural gas pipelines (distance per county) · Nov 1, 2026 · Public domain · for on-site generation
Industrial power price
72.1$/MWh
EIA, industrial retail electricity price · Aug 1, 2026 · Public domain · state average
Grid peak and annual demand (ERCOT)
91.1GW
eia-930-demand-profile · Nov 21, 2026 · peak hour, last 12 months · 509 TWh a year · ISO-wide, not this county
TX installed capacity above last year's peak
+96.1%
EIA, operating generator capacity by county · Aug 1, 2026 · Public domain · 178.6 GW installed vs 91.1 GW peak · firm only -4.2%
Queued MW per substation
1,266MW
ercotqueue.com, interconnection queue projects · CC BY 4.0 · 3,798 MW queued across 3 substations
Utilities serving the county
City of Bridgeport - (TX) · Cooke County Elec Coop Assn · Denton County Elec Coop, Inc · Oncor Electric Delivery Company LLC · Tri-County Electric Coop, Inc (TX) · Wise Electric Coop Inc

Generation mix

Operating capacity by energy source.

Natural GasElectricity used for energy storage

Transmission substations

Substations at the ends of 115 kV and higher lines, from HIFLD.

SubstationkVOwner
Hicks345ONCOR ELECTRIC DELIVERY CO.
Rhome138ONCOR ELECTRIC DELIVERY CO.
Peden Rd138ONCOR ELECTRIC DELIVERY CO.
Land

Wise County land availability and cost

Large parcels (100 acres or more), open land, land value per acre, protected land, floodplain, soil limits, brownfields, and water access for the county.

Farms of 100+ acres
984farms
USDA Census of Agriculture, county land value and farm sizes · Jan 1, 2022 · Public domain · 82 of 1,000+ acres
Open (unbuilt) land
412,238acres
USDA CropScape, land cover by county · Public domain · 69.8% of the county
Farmland value per acre
$6,259per acre
USDA Census of Agriculture, county land value and farm sizes · Jan 1, 2022 · Public domain · agricultural land and buildings, 2022
Protected or public land
3.4%
Floodplain share
12.3%
Soil constraint
28% affected
NRCS SSURGO, soil constraints by county · Public domain · hydric 0.1% · shallow bedrock 27.8%
Brownfield sites
0sites
EPA, brownfield sites by county · Nov 1, 2026 · Public domain · none on the EPA register for this county
Distance to nearest river
2.5km
USA Rivers and Streams (distance per county) · Nov 1, 2026 · to nearest mapped river

Land cover

Share of classified land, from the USDA Cropland Data Layer.

grassland65.83%
forest15.77%
developed10.25%
cropland2.31%
water2.25%
barren1.64%
wetlands1.19%
pasture hay0.73%
shrubland0.03%
USDA CropScape, land cover by county · Public domain
Nearby data centers

Data centers in and near Wise County

Operating data centers in the county and within 50 km, with their operators and distance from the county center.

Mapped data centers in county
0
Data centers within 50 km
8
Straight-line distance from the county center
Mapped footprint
0sq ft
IM3 Data Center Atlas (PNNL) · Nov 16, 2026 · ODbL 1.0 · no mapped data centre in this county
Projected future locations (IM3 model)
0locations
IM3, projected data-centre locations · Nov 16, 2026 · ODbL 1.0 · none projected here — IM3 model output, not announcements
FacilityOperatorDistanceIn county
CyrusOneCyrusOne36.8 km—
QTS Data CenterQuality Technology Services39.5 km—
Charles Schwab Data Center—39.8 km—
Facebook Fort Worth DatacenterMeta39.8 km—
CITIGROUP TECHNOLOGY INC—39.8 km—
Facebook Fort Worth DatacenterMeta39.9 km—
Facebook Fort Worth DatacenterMeta40.1 km—
Verizon Wireless Mew Building—48.9 km—

Mapped facilities are operating sites from the IM3 Atlas. Announced campuses not yet built come from Epoch AI and are not assigned to a county.

Risk

Wise County natural hazard and permitting risk

FEMA hazard scores and disaster history, air-permitted data centers, local opposition, and ERCOT rule changes that apply to the county.

FEMA National Risk Index score
59score
FEMA National Risk Index · Public domain · Relatively Low
Expected annual loss
$20.3m
FEMA National Risk Index · Public domain
Disaster declarations since 2010
2
Air-permitted data centres
0facilities
none in this county · epa-echo-datacentre-air

Hazard scores

FEMA hazard risk scores, shown as national percentiles rather than the probability of loss at a site.

wildfire (Relatively Moderate)94
hail (Relatively Moderate)87
heat wave (Relatively Moderate)86
tornado (Relatively Moderate)76
inland flooding (Relatively Low)60
strong wind (Relatively Low)48

Moratoriums, filings and opposition

No moratorium, ordinance, or opposition news names Wise County in the last 30 days. Sources: GDELT news coverage. CEQA filings cover California only.

TX policy changes (statewide)

  • 24 Sept 2026
    Voluntary community-impact RFI option for newly substantiated medium loads
  • 21 Sept 2026
    RIOO RFI visibility restrictions and public question guides
  • 14 Sept 2026
    State and Community Impact RFI issued
  • 09 Sept 2026
    Batch Zero eligibility-verification RFIs issued
  • 04 Sept 2026
    RIOO Off-cycle Release
Local economy

Wise County construction activity and data center jobs

Data processing and hosting businesses and jobs, and residential building permits as a measure of local construction activity.

Data processing and hosting locations
2establishments
Data processing and hosting jobs
Withheld
BLS QCEW, data-centre establishments and jobs by county · Public domain · BLS suppresses it where a few employers would be identifiable
Residential units permitted
402permits
Census Building Permits Survey, county (residential) · Jan 1, 2025 · Public domain · Residential only; excludes data centers
Residential permit value
$113.4m
County map
Loading map…
Charts

Wise County queue and demand charts

Queue in county by study stage

Active generation and storage, MW.

0 MW761 MW1521 MW2282 MW3042 MWStudiedIn studyIA signed

This county against the state median

Each figure as a multiple of the TX county median. 1.0 is typical.

Generation queue MW2.73×
Studied share0.68×
Transmission substations3×
Km to 115 kV+1.94×
Km to gas pipeline1.53×

Hourly demand profile (TX)

Average TX-wide demand by local hour over the last 14 days, MW.

0 GW13 GW27 GW40 GW53 GW000102030405060708091011121314151617181920212223eia-930-demand-profile · Nov 21, 2026

Queued MW in this county by expected online year

Active generation and storage requests, by the year each expects to connect.

0 MW551 MW1101 MW1652 MW2202 MW2026202720282029ercotqueue.com, interconnection queue projects · CC BY 4.0
Sources

Sources for every Wise County figure

FigureValueAs ofSourceLicense
Wise County — 402 residential units permitted, 2025402 permits01 Jan 2025Census Building Permits Survey — county (residential)US federal work, public domain
Wise County — $113,418,875 residential permit value, 2025113,418,875 USD01 Jan 2025Census Building Permits Survey — county (residential)US federal work, public domain
48497 — wetlands 1.19% of classified land (2025)1.19 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48497 — forest 15.77% of classified land (2025)15.77 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48497 — pasture hay 0.73% of classified land (2025)0.73 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48497 — water 2.25% of classified land (2025)2.25 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48497 — cropland 2.31% of classified land (2025)2.31 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48497 — barren 1.64% of classified land (2025)1.64 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48497 — shrubland 0.03% of classified land (2025)0.03 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48497 — grassland 65.83% of classified land (2025)65.83 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48497 — developed 10.25% of classified land (2025)10.25 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48497 — data-centre employment (2025) — suppressedsuppressed for confidentiality01 Jan 2025BLS QCEW — data-centre establishments and jobs by countyBLS Quarterly Census of Employment and Wages (US federal work, public domain)
48497 — 2 data-centre establishments (2025)2 establishments01 Jan 2025BLS QCEW — data-centre establishments and jobs by countyBLS Quarterly Census of Employment and Wages (US federal work, public domain)
Wise County — farmland $6,259 an acre (2022)6,259 USD per acre01 Jan 2022USDA Census of Agriculture — county land value and farm sizesUSDA NASS Census of Agriculture 2022 (US federal work, public domain)
Wise County — 12.34% in FEMA's 1% annual-chance floodplain12.34 %—FEMA flood hazard areas — floodplain shareFEMA National Flood Hazard Layer (US federal work, public domain), served by Esri Living Atlas
Wise County — 984 farms of 100+ acres (2022)984 farms01 Jan 2022USDA Census of Agriculture — county land value and farm sizesUSDA NASS Census of Agriculture 2022 (US federal work, public domain)
Wise County — 3.43% protected or public land3.43 %—USGS PAD-US — protected and public land shareUS federal work, public domain
Wise — shallow bedrock 27.8%27.8 %—NRCS SSURGO — soil constraints by countyUS federal work, public domain
Wise County — 2.5 km to nearest mapped river2.5 km01 Nov 2026USA Rivers and Streams (distance per county)Esri Living Atlas, derived from USGS NHD (public domain)
Wise County — 4.36 km to nearest natural-gas pipeline4.36 km01 Nov 2026EIA — natural gas pipelines (distance per county)US federal work (EIA), public domain
Withdrawn: Yooperlite Storage — Battery, 175.65 MW, Wise175.65 MW01 Oct 2026ercotqueue.com — monthly queue changesCC BY 4.0 — ercotqueue.com
Wise County — 3 transmission substations (max 345 kV)3 substations01 Nov 2026HIFLD — transmission lines and substationsUS federal work (HIFLD), public domain
Wise County — 4.22 km to nearest 115 kV+ line4.22 km01 Nov 2026HIFLD — transmission lines and substationsUS federal work (HIFLD), public domain
Tri-County Electric Coop, Inc (TX) serves Wise CountyTri-County Electric Coop, Inc (TX)01 Jan 2025EIA-861 — utility service territory by countyUS federal work, public domain
Oncor Electric Delivery Company LLC serves Wise CountyOncor Electric Delivery Company LLC01 Jan 2025EIA-861 — utility service territory by countyUS federal work, public domain
City of Bridgeport - (TX) serves Wise CountyCity of Bridgeport - (TX)01 Jan 2025EIA-861 — utility service territory by countyUS federal work, public domain
Cooke County Elec Coop Assn serves Wise CountyCooke County Elec Coop Assn01 Jan 2025EIA-861 — utility service territory by countyUS federal work, public domain
Wise Electric Coop Inc serves Wise CountyWise Electric Coop Inc01 Jan 2025EIA-861 — utility service territory by countyUS federal work, public domain
Denton County Elec Coop, Inc serves Wise CountyDenton County Elec Coop, Inc01 Jan 2025EIA-861 — utility service territory by countyUS federal work, public domain
Wise — expected annual loss $20.3m20,319,228.65 USD—FEMA National Risk IndexUS federal work (FEMA), public domain
Wise — NRI risk score 59.0 (Relatively Low)58.97 score—FEMA National Risk IndexUS federal work (FEMA), public domain

Derived figures — the band, readiness, studied share and comparisons — are CUDO derivations and say so wherever they appear.