Fort Bend County, TX data center site data

Time to power, land, grid capacity, and risk for Fort Bend County, with a source and date for every figure.

Site summary

Fort Bend County time to power and site score

An estimated time-to-power band and a weighted site score summarize the county’s power access, queue readiness, gas access, land, and hazards.

Estimated time-to-power band
<2 yrs
Readiness
Interconnection agreement signed

Top risks

  1. Top natural hazards (FEMA NRI): tornado, heat wave, inland flooding.
Estimated site score, weighted
76/ 100
  • 35%Power access: 99 · max 345 kV substation; 1.4 km to a 115 kV+ line
  • 20%Queue readiness: 58 · 57.7% of queued MW has a completed study
  • 15%Gas access: 100 · 0.1 km to a gas pipeline
  • 15%Land available: 98 · 2.4% protected or public land
  • 15%Hazard: 3 · FEMA risk index 97.5
Power

Fort Bend County grid capacity and interconnection queue

Generation queued and operating in the county, transmission and gas access, power prices, and the TX-wide demand that new large loads compete with.

Generation and storage queue
1,618MW
Studied share of queue
933MW
57.7% of queued MW — derived from ISO status
Large-load queue (ERCOT, state total)
466.5GW
ercotqueue.com, ERCOT large-load funnel · Jun 18, 2026 · CC BY 4.0 · ERCOT publishes large loads for Texas as a whole; no public source names the county
Operating generation
14.4GW
Transmission substations
30substations
HIFLD, transmission lines and substations · Nov 1, 2026 · Public domain · max 345 kV
Distance to 115 kV+ line
1.4km
HIFLD, transmission lines and substations · Nov 1, 2026 · Public domain · from county centre
Distance to gas pipeline
0.1km
EIA, natural gas pipelines (distance per county) · Nov 1, 2026 · Public domain · for on-site generation
Industrial power price
72.1$/MWh
EIA, industrial retail electricity price · Aug 1, 2026 · Public domain · state average
Grid peak and annual demand (ERCOT)
91.1GW
eia-930-demand-profile · Nov 22, 2026 · peak hour, last 12 months · 509 TWh a year · ISO-wide, not this county
TX installed capacity above last year's peak
+96.1%
EIA, operating generator capacity by county · Aug 1, 2026 · Public domain · 178.6 GW installed vs 91.1 GW peak · firm only -4.2%
Queued MW per substation
54MW
ercotqueue.com, interconnection queue projects · CC BY 4.0 · 1,618 MW queued across 30 substations
Utilities serving the county
CenterPoint Energy

Generation mix

Operating capacity by energy source.

Subbituminous CoalNatural GasSolarElectricity used for energy storageDisillate Fuel Oil

Transmission substations

Substations at the ends of 115 kV and higher lines, from HIFLD.

SubstationkVOwner
Sotex5345CENTERPOINT ENERGY
O'Brien345CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
Parish345CENTERPOINT ENERGY
Oasis345CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
Parish345CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
O'Brien345CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
Addicks345CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
Dewalt138CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
Arcola138CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
Quail Valley138CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
Land

Fort Bend County land availability and cost

Large parcels (100 acres or more), open land, land value per acre, protected land, floodplain, soil limits, brownfields, and water access for the county.

Farms of 100+ acres
441farms
USDA Census of Agriculture, county land value and farm sizes · Jan 1, 2022 · Public domain · 112 of 1,000+ acres
Open (unbuilt) land
311,851acres
USDA CropScape, land cover by county · Public domain · 55% of the county
Farmland value per acre
$4,398per acre
USDA Census of Agriculture, county land value and farm sizes · Jan 1, 2022 · Public domain · agricultural land and buildings, 2022
Protected or public land
2.4%
Floodplain share
28%
Soil constraint
Nonematerial
NRCS SSURGO, soil constraints by county · Public domain · hydric 7.3% · shallow bedrock 0%
Brownfield sites
0sites
EPA, brownfield sites by county · Nov 1, 2026 · Public domain · none on the EPA register for this county
Distance to nearest river
0.1km
USA Rivers and Streams (distance per county) · Nov 1, 2026 · to nearest mapped river

Land cover

Share of classified land, from the USDA Cropland Data Layer.

grassland40.62%
developed32.7%
cropland12.46%
wetlands8.44%
water1.89%
forest1.55%
barren1.39%
shrubland0.57%
pasture hay0.38%
USDA CropScape, land cover by county · Public domain
Nearby data centers

Data centers in and near Fort Bend County

Operating data centers in the county and within 50 km, with their operators and distance from the county center.

Mapped data centers in county
0
Data centers within 50 km
7
Straight-line distance from the county center
Mapped footprint
0sq ft
IM3 Data Center Atlas (PNNL) · Nov 23, 2026 · ODbL 1.0 · no mapped data centre in this county
Projected future locations (IM3 model)
0locations
IM3, projected data-centre locations · Nov 23, 2026 · ODbL 1.0 · none projected here — IM3 model output, not announcements
FacilityOperatorDistanceIn county
Skybox Houston OneSkybox21.5 km—
Rice Data Center—23.4 km—
Data centre—24.8 km—
DXC TechnologyDXC Technology43.2 km—
DXC TechnologyDXC Technology43.4 km—
Data Foundry—43.8 km—
DXC TechnologyDXC Technology47.7 km—

Mapped facilities are operating sites from the IM3 Atlas. Announced campuses not yet built come from Epoch AI and are not assigned to a county.

Risk

Fort Bend County natural hazard and permitting risk

FEMA hazard scores and disaster history, air-permitted data centers, local opposition, and ERCOT rule changes that apply to the county.

FEMA National Risk Index score
97.5score
FEMA National Risk Index · Public domain · Relatively High
Expected annual loss
$346.2m
FEMA National Risk Index · Public domain
Disaster declarations since 2010
5
Air-permitted data centres
0facilities
none in this county · epa-echo-datacentre-air

Hazard scores

FEMA hazard risk scores, shown as national percentiles rather than the probability of loss at a site.

tornado (Very High)99
heat wave (Relatively High)98
inland flooding (Relatively High)98
hurricane (Relatively High)98
strong wind (Relatively High)94
drought (Relatively Moderate)85

Moratoriums, filings and opposition

No moratorium, ordinance, or opposition news names Fort Bend County in the last 30 days. Sources: GDELT news coverage. CEQA filings cover California only.

TX policy changes (statewide)

  • 24 Sept 2026
    Voluntary community-impact RFI option for newly substantiated medium loads
  • 21 Sept 2026
    RIOO RFI visibility restrictions and public question guides
  • 14 Sept 2026
    State and Community Impact RFI issued
  • 09 Sept 2026
    Batch Zero eligibility-verification RFIs issued
  • 04 Sept 2026
    RIOO Off-cycle Release
Local economy

Fort Bend County construction activity and data center jobs

Data processing and hosting businesses and jobs, and residential building permits as a measure of local construction activity.

Data processing and hosting locations
42establishments
Data processing and hosting jobs
210jobs
Residential units permitted
12,487permits
Census Building Permits Survey, county (residential) · Jan 1, 2025 · Public domain · Residential only; excludes data centers
Residential permit value
$3.3bn
County map
Loading map…
Charts

Fort Bend County queue and demand charts

Queue in county by study stage

Active generation and storage, MW.

0 MW183 MW366 MW548 MW731 MWIn studyIA signedStudied

This county against the state median

Each figure as a multiple of the TX county median. 1.0 is typical.

Generation queue MW1.16×
Studied share1.98×
Transmission substations30×
Km to 115 kV+0.65×
Km to gas pipeline0.04×

Hourly demand profile (TX)

Average TX-wide demand by local hour over the last 14 days, MW.

0 GW13 GW27 GW40 GW54 GW000102030405060708091011121314151617181920212223eia-930-demand-profile · Nov 22, 2026

Queued MW in this county by expected online year

Active generation and storage requests, by the year each expects to connect.

0 MW181 MW363 MW544 MW725 MW20262027202820292030ercotqueue.com, interconnection queue projects · CC BY 4.0
Sources

Sources for every Fort Bend County figure

FigureValueAs ofSourceLicense
Fort Bend County — 12487 residential units permitted, 202512,487 permits01 Jan 2025Census Building Permits Survey — county (residential)US federal work, public domain
Fort Bend County — $3,255,582,827 residential permit value, 20253,255,582,827 USD01 Jan 2025Census Building Permits Survey — county (residential)US federal work, public domain
48157 — shrubland 0.57% of classified land (2025)0.57 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48157 — cropland 12.46% of classified land (2025)12.46 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48157 — forest 1.55% of classified land (2025)1.55 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48157 — water 1.89% of classified land (2025)1.89 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48157 — grassland 40.62% of classified land (2025)40.62 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48157 — pasture hay 0.38% of classified land (2025)0.38 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48157 — developed 32.7% of classified land (2025)32.7 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48157 — barren 1.39% of classified land (2025)1.39 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48157 — wetlands 8.44% of classified land (2025)8.44 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48157 — data-centre employment (2025): 210210 jobs01 Jan 2025BLS QCEW — data-centre establishments and jobs by countyBLS Quarterly Census of Employment and Wages (US federal work, public domain)
Fort Bend County — data centre employment, 2023305 employees01 Jan 2023Census County Business Patterns — NAICS 518210US federal work, public domain
48157 — 42 data-centre establishments (2025)42 establishments01 Jan 2025BLS QCEW — data-centre establishments and jobs by countyBLS Quarterly Census of Employment and Wages (US federal work, public domain)
Fort Bend County — data centre establishments, 202328 establishments01 Jan 2023Census County Business Patterns — NAICS 518210US federal work, public domain
Fort Bend County — farmland $4,398 an acre (2022)4,398 USD per acre01 Jan 2022USDA Census of Agriculture — county land value and farm sizesUSDA NASS Census of Agriculture 2022 (US federal work, public domain)
Fort Bend County — 27.96% in FEMA's 1% annual-chance floodplain27.96 %—FEMA flood hazard areas — floodplain shareFEMA National Flood Hazard Layer (US federal work, public domain), served by Esri Living Atlas
Fort Bend County — 441 farms of 100+ acres (2022)441 farms01 Jan 2022USDA Census of Agriculture — county land value and farm sizesUSDA NASS Census of Agriculture 2022 (US federal work, public domain)
Fort Bend County — 2.35% protected or public land2.35 %—USGS PAD-US — protected and public land shareUS federal work, public domain
Fort Bend — no material soil constraint7.3 %—NRCS SSURGO — soil constraints by countyUS federal work, public domain
Fort Bend County — 0.05 km to nearest mapped river0.05 km01 Nov 2026USA Rivers and Streams (distance per county)Esri Living Atlas, derived from USGS NHD (public domain)
Fort Bend County — 0.12 km to nearest natural-gas pipeline0.12 km01 Nov 2026EIA — natural gas pipelines (distance per county)US federal work (EIA), public domain
Withdrawn: Pato Blanco Storage — Battery, 71.34 MW, Fort Bend71.34 MW01 Oct 2026ercotqueue.com — monthly queue changesCC BY 4.0 — ercotqueue.com
Fort Bend County — 30 transmission substations (max 345 kV)30 substations01 Nov 2026HIFLD — transmission lines and substationsUS federal work (HIFLD), public domain
Fort Bend County — 1.42 km to nearest 115 kV+ line1.42 km01 Nov 2026HIFLD — transmission lines and substationsUS federal work (HIFLD), public domain
CenterPoint Energy serves Fort Bend CountyCenterPoint Energy01 Jan 2025EIA-861 — utility service territory by countyUS federal work, public domain
Fort Bend — expected annual loss $346.2m346,168,109.24 USD—FEMA National Risk IndexUS federal work (FEMA), public domain
Fort Bend — NRI risk score 97.5 (Relatively High)97.46 score—FEMA National Risk IndexUS federal work (FEMA), public domain

Derived figures — the band, readiness, studied share and comparisons — are CUDO derivations and say so wherever they appear.