Solano County, CA data center site data
Time to power, land, grid capacity, and risk for Solano County, with a source and date for every figure.
Solano County time to power and site score
An estimated time-to-power band and a weighted site score summarize the county’s power access, queue readiness, gas access, land, and hazards.
- Readiness
- Studied, not yet agreed
Top risks
- Top natural hazards (FEMA NRI): drought, earthquake, inland flooding.
- 35%Power access: 100 · max 500 kV substation; 0.2 km to a 115 kV+ line
- 20%Queue readiness: 100 · 100.0% of queued MW has a completed study
- 15%Gas access: 99 · 0.5 km to a gas pipeline
- 15%Land available: 90 · 10.2% protected or public land
- 15%Hazard: 3 · FEMA risk index 97.0
Solano County grid capacity and interconnection queue
Generation queued and operating in the county, transmission and gas access, power prices, and the CA-wide demand that new large loads compete with.
Generation mix
Operating capacity by energy source.
Transmission substations
Substations at the ends of 115 kV and higher lines, from HIFLD.
| Substation | kV | Owner |
|---|---|---|
| Vaca-Dixon | 500 | PACIFIC GAS & ELECTRIC COMPANY |
| Vaca-Dixon | 230 | PACIFIC GAS & ELECTRIC COMPANY |
| Peabody | 230 | PACIFIC GAS & ELECTRIC COMPANY |
| Lakeville | 230 | PACIFIC GAS & ELECTRIC COMPANY |
| Birds Landing | 230 | PACIFIC GAS & ELECTRIC COMPANY |
| Vaca-Dixon | 230 | PACIFIC GAS & ELECTRIC COMPANY |
| Delevan | 230 | PACIFIC GAS & ELECTRIC COMPANY |
| Lambie | 230 | PACIFIC GAS & ELECTRIC COMPANY |
| Birds Landing | 230 | PACIFIC GAS & ELECTRIC COMPANY |
| Peabody | 230 | PACIFIC GAS & ELECTRIC COMPANY |
Solano County land availability and cost
Large parcels (100 acres or more), open land, land value per acre, protected land, floodplain, soil limits, brownfields, and water access for the county.
Land cover
Share of classified land, from the USDA Cropland Data Layer.
USDA CropScape, land cover by county · Public domainData centers in and near Solano County
Operating data centers in the county and within 50 km, with their operators and distance from the county center.
| Facility | Operator | Distance | In county |
|---|---|---|---|
| PG&E Datacenter | — | 1.1 km | Yes |
| Kaiser Data Center | — | 18.1 km | — |
| e360 | — | 29.6 km | — |
| Open Computing Facility | — | 44.1 km | — |
Mapped facilities are operating sites from the IM3 Atlas. Announced campuses not yet built come from Epoch AI and are not assigned to a county.
Solano County natural hazard and permitting risk
FEMA hazard scores and disaster history, air-permitted data centers, local opposition, and ERCOT rule changes that apply to the county.
Hazard scores
FEMA hazard risk scores, shown as national percentiles rather than the probability of loss at a site.
Moratoriums, filings and opposition
- 05 Feb 2026
CA policy changes (statewide)
- 19 Nov 2026
- 14 Jul 2026
- 08 Jul 2026
- 21 Apr 2026
- 15 Jan 2026
Solano County construction activity and data center jobs
Data processing and hosting businesses and jobs, and residential building permits as a measure of local construction activity.
Solano County queue and demand charts
Queue in county by study stage
Active generation and storage, MW.
This county against the state median
Each figure as a multiple of the CA county median. 1.0 is typical.
Hourly demand profile (CA)
Average CA-wide demand by local hour over the last 15 days, MW.
eia-930-demand-profile · Nov 22, 2026Queued MW in this county by expected online year
Active generation and storage requests, by the year each expects to connect.
No dated queue requests in this county.
Sources for every Solano County figure
| Figure | Value | As of | Source | License |
|---|---|---|---|---|
| Solano County — 1 mapped data-centre facilities | 1 facilities | — | IM3 Data Center Atlas (PNNL) | ODbL 1.0 (IM3 Open Source Data Center Atlas, PNNL) |
| Solano County — 55,270 sq ft of mapped data-centre footprint | 55,270 sq ft | — | IM3 Data Center Atlas (PNNL) | ODbL 1.0 (IM3 Open Source Data Center Atlas, PNNL) |
| NOE 2026020164 — Vacaville Data Center-1020 Vaquero Circle | Vacaville Data Center-1020 Vaquero Circle | 05 Feb 2026 | CEQAnet — data center environmental filings | California public record (CEQAnet, State of California) |
| Solano — 1 CEQA filings mentioning data centres since 2021 | 1 filings | 01 Jan 2021 | CEQAnet — data-centre filings per county | California public record (CEQAnet, State of California) |
| Solano County — 881 residential units permitted, 2025 | 881 permits | 01 Jan 2025 | Census Building Permits Survey — county (residential) | US federal work, public domain |
| Solano County — $287,438,200 residential permit value, 2025 | 287,438,200 USD | 01 Jan 2025 | Census Building Permits Survey — county (residential) | US federal work, public domain |
| Solano — 5 brownfield sites | 5 sites | — | EPA — brownfield sites by county | US federal work, public domain |
| 06095 — cropland 27.17% of classified land (2025) | 27.17 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 06095 — forest 1.41% of classified land (2025) | 1.41 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 06095 — pasture hay 1.16% of classified land (2025) | 1.16 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 06095 — water 7.92% of classified land (2025) | 7.92 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 06095 — developed 14.67% of classified land (2025) | 14.67 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 06095 — wetlands 12.91% of classified land (2025) | 12.91 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 06095 — grassland 28.8% of classified land (2025) | 28.8 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 06095 — barren 1.26% of classified land (2025) | 1.26 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 06095 — shrubland 4.7% of classified land (2025) | 4.7 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 06095 — data-centre employment (2025): 107 | 107 jobs | 01 Jan 2025 | BLS QCEW — data-centre establishments and jobs by county | BLS Quarterly Census of Employment and Wages (US federal work, public domain) |
| 06095 — 14 data-centre establishments (2025) | 14 establishments | 01 Jan 2025 | BLS QCEW — data-centre establishments and jobs by county | BLS Quarterly Census of Employment and Wages (US federal work, public domain) |
| Solano County — farmland $12,901 an acre (2022) | 12,901 USD per acre | 01 Jan 2022 | USDA Census of Agriculture — county land value and farm sizes | USDA NASS Census of Agriculture 2022 (US federal work, public domain) |
| Solano County — 39.28% in FEMA's 1% annual-chance floodplain | 39.28 % | — | FEMA flood hazard areas — floodplain share | FEMA National Flood Hazard Layer (US federal work, public domain), served by Esri Living Atlas |
| Solano County — 324 farms of 100+ acres (2022) | 324 farms | 01 Jan 2022 | USDA Census of Agriculture — county land value and farm sizes | USDA NASS Census of Agriculture 2022 (US federal work, public domain) |
| Solano County — 10.19% protected or public land | 10.19 % | — | USGS PAD-US — protected and public land share | US federal work, public domain |
| Solano — hydric soils 21.8%; shallow bedrock 23.2% | 23.2 % | — | NRCS SSURGO — soil constraints by county | US federal work, public domain |
| Solano County — 3.1 km to nearest mapped river | 3.1 km | 01 Nov 2026 | USA Rivers and Streams (distance per county) | Esri Living Atlas, derived from USGS NHD (public domain) |
| Solano County — 0.49 km to nearest natural-gas pipeline | 0.49 km | 01 Nov 2026 | EIA — natural gas pipelines (distance per county) | US federal work (EIA), public domain |
| Solano County — 23 transmission substations (max 500 kV) | 23 substations | 01 Nov 2026 | HIFLD — transmission lines and substations | US federal work (HIFLD), public domain |
| Solano County — 0.2 km to nearest 115 kV+ line | 0.2 km | 01 Nov 2026 | HIFLD — transmission lines and substations | US federal work (HIFLD), public domain |
| WAPA-- Western Area Power Administration serves Solano County | WAPA-- Western Area Power Administration | 01 Jan 2025 | EIA-861 — utility service territory by county | US federal work, public domain |
| Pittsburg Power Company serves Solano County | Pittsburg Power Company | 01 Jan 2025 | EIA-861 — utility service territory by county | US federal work, public domain |
| Pacific Gas & Electric Co. serves Solano County | Pacific Gas & Electric Co. | 01 Jan 2025 | EIA-861 — utility service territory by county | US federal work, public domain |
| Solano — expected annual loss $292.1m | 292,106,753.18 USD | — | FEMA National Risk Index | US federal work (FEMA), public domain |
| Solano — NRI risk score 97.0 (Relatively High) | 97.01 score | — | FEMA National Risk Index | US federal work (FEMA), public domain |
Derived figures — the band, readiness, studied share and comparisons — are CUDO derivations and say so wherever they appear.