Yoakum County time to power and site score
An estimated time-to-power band and a weighted site score summarize the county’s power access, queue readiness, gas access, land, and hazards.
- Readiness
- —
Top risks
- Top natural hazards (FEMA NRI): drought, hail, wildfire.
- 35%Power access: 84 · max 230 kV substation; 0.6 km to a 115 kV+ line
- 20%Queue readiness: — · no queue entries
- 15%Gas access: 91 · 4.3 km to a gas pipeline
- 15%Land available: 98 · 1.6% protected or public land
- 15%Hazard: 54 · FEMA risk index 46.1
Yoakum County land availability and cost
Large parcels (100 acres or more), open land, land value per acre, protected land, floodplain, soil limits, brownfields, and water access for the county.
Land cover
Share of classified land, from the USDA Cropland Data Layer.
USDA CropScape, land cover by county · Public domainData centers in and near Yoakum County
Operating data centers in the county and within 50 km, with their operators and distance from the county center.
No mapped data centre within 50 km of the county centre.
Mapped facilities are operating sites from the IM3 Atlas. Announced campuses not yet built come from Epoch AI and are not assigned to a county.
Yoakum County natural hazard and permitting risk
FEMA hazard scores and disaster history, air-permitted data centers, local opposition, and ERCOT rule changes that apply to the county.
Hazard scores
FEMA hazard risk scores, shown as national percentiles rather than the probability of loss at a site.
Moratoriums, filings and opposition
No moratorium, ordinance, or opposition news names Yoakum County in the last 30 days. Sources: GDELT news coverage. CEQA filings cover California only.
TX policy changes (statewide)
- 24 Sept 2026Voluntary community-impact RFI option for newly substantiated medium loads
- 21 Sept 2026RIOO RFI visibility restrictions and public question guides
- 14 Sept 2026State and Community Impact RFI issued
- 09 Sept 2026Batch Zero eligibility-verification RFIs issued
- 04 Sept 2026RIOO Off-cycle Release
Yoakum County grid capacity and interconnection queue
Generation queued and operating in the county, transmission and gas access, power prices, and the TX-wide demand that new large loads compete with.
Generation mix
Operating capacity by energy source.
Transmission substations
Substations at the ends of 115 kV and higher lines, from HIFLD.
| Substation | kV | Owner |
|---|---|---|
| Denver City | 230 | LEA COUNTY ELECTRIC COOP, INC |
| Seminole | 230 | LEA COUNTY ELECTRIC COOP, INC |
| Ltg-Seagrav | 115 | LEA COUNTY ELECTRIC COOP, INC |
| Denver City | 115 | SOUTHWESTERN PUBLIC SERVICE CO. |
| Arco Bp-Willard | 115 | LEA COUNTY ELECTRIC COOP, INC |
| C2 | 115 | SOUTHWESTERN PUBLIC SERVICE CO. |
| Shell Co2 | 115 | SOUTHWESTERN PUBLIC SERVICE CO. |
| Shell C3 | 115 | SOUTHWESTERN PUBLIC SERVICE CO. |
| Terry Co | 115 | LYNTEGAR ELECTRIC COOP, INC |
Yoakum County construction activity and data center jobs
Data processing and hosting businesses and jobs, and residential building permits as a measure of local construction activity.
Yoakum County queue and demand charts
Queue in county by study stage
Active generation and storage, MW.
No active generation or storage requests in this county.
This county against the state median
Each figure as a multiple of the TX county median. 1.0 is typical.
Hourly demand profile (TX)
Average TX-wide demand by local hour over the last 14 days, MW.
eia-930-demand-profile · Nov 22, 2026Queued MW in this county by expected online year
Active generation and storage requests, by the year each expects to connect.
No dated queue requests in this county.
Sources for every Yoakum County figure
| Figure | Value | As of | Source | License |
|---|---|---|---|---|
| Yoakum County — 1 residential units permitted, 2025 | 1 permits | 01 Jan 2025 | Census Building Permits Survey — county (residential) | US federal work, public domain |
| Yoakum County — $260,000 residential permit value, 2025 | 260,000 USD | 01 Jan 2025 | Census Building Permits Survey — county (residential) | US federal work, public domain |
| Yoakum — 1 brownfield sites | 1 sites | — | EPA — brownfield sites by county | US federal work, public domain |
| 48501 — barren 0.19% of classified land (2025) | 0.19 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48501 — forest 0.06% of classified land (2025) | 0.06 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48501 — grassland 0.1% of classified land (2025) | 0.1 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48501 — developed 5.45% of classified land (2025) | 5.45 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48501 — water 0.02% of classified land (2025) | 0.02 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48501 — wetlands 0.14% of classified land (2025) | 0.14 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48501 — cropland 38.4% of classified land (2025) | 38.4 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48501 — shrubland 55.65% of classified land (2025) | 55.65 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48501 — pasture hay 0.0% of classified land (2025) | 0 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48501 — data-centre employment (2025): 0 | 0 jobs | 01 Jan 2025 | BLS QCEW — data-centre establishments and jobs by county | BLS Quarterly Census of Employment and Wages (US federal work, public domain) |
| 48501 — 0 data-centre establishments (2025) | 0 establishments | 01 Jan 2025 | BLS QCEW — data-centre establishments and jobs by county | BLS Quarterly Census of Employment and Wages (US federal work, public domain) |
| Yoakum County — farmland $1,606 an acre (2022) | 1,606 USD per acre | 01 Jan 2022 | USDA Census of Agriculture — county land value and farm sizes | USDA NASS Census of Agriculture 2022 (US federal work, public domain) |
| Yoakum County — 320 farms of 100+ acres (2022) | 320 farms | 01 Jan 2022 | USDA Census of Agriculture — county land value and farm sizes | USDA NASS Census of Agriculture 2022 (US federal work, public domain) |
| Yoakum County — 1.58% protected or public land | 1.58 % | — | USGS PAD-US — protected and public land share | US federal work, public domain |
| Yoakum — no material soil constraint | 0 % | — | NRCS SSURGO — soil constraints by county | US federal work, public domain |
| Yoakum County — 1.72 km to nearest mapped river | 1.72 km | 01 Nov 2026 | USA Rivers and Streams (distance per county) | Esri Living Atlas, derived from USGS NHD (public domain) |
| Yoakum County — 4.29 km to nearest natural-gas pipeline | 4.29 km | 01 Nov 2026 | EIA — natural gas pipelines (distance per county) | US federal work (EIA), public domain |
| Yoakum County — 9 transmission substations (max 230 kV) | 9 substations | 01 Nov 2026 | HIFLD — transmission lines and substations | US federal work (HIFLD), public domain |
| Yoakum County — 0.55 km to nearest 115 kV+ line | 0.55 km | 01 Nov 2026 | HIFLD — transmission lines and substations | US federal work (HIFLD), public domain |
| Lea County Electric Coop, Inc - (NM) serves Yoakum County | Lea County Electric Coop, Inc - (NM) | 01 Jan 2025 | EIA-861 — utility service territory by county | US federal work, public domain |
| Lyntegar Electric Coop, Inc serves Yoakum County | Lyntegar Electric Coop, Inc | 01 Jan 2025 | EIA-861 — utility service territory by county | US federal work, public domain |
| Southwestern Public Service Co serves Yoakum County | Southwestern Public Service Co | 01 Jan 2025 | EIA-861 — utility service territory by county | US federal work, public domain |
| Yoakum — expected annual loss $8.5m | 8,474,017.8 USD | — | FEMA National Risk Index | US federal work (FEMA), public domain |
| Yoakum — NRI risk score 46.1 (Relatively Low) | 46.06 score | — | FEMA National Risk Index | US federal work (FEMA), public domain |
Derived figures — the band, readiness, studied share and comparisons — are CUDO derivations and say so wherever they appear.
Talk to us about Yoakum County
Bring the site and the date. We will walk the evidence with you.
Start a conversation