Navarro County, TX data center site data
Time to power, land, grid capacity, and risk for Navarro County, with a source and date for every figure.
Navarro County time to power and site score
An estimated time-to-power band and a weighted site score summarize the county’s power access, queue readiness, gas access, land, and hazards.
- Readiness
- Interconnection agreement signed
Top risks
- Top natural hazards (FEMA NRI): tornado, strong wind, heat wave.
- 35%Power access: 99 · max 345 kV substation; 1.4 km to a 115 kV+ line
- 20%Queue readiness: 66 · 65.5% of queued MW has a completed study
- 15%Gas access: 95 · 2.4 km to a gas pipeline
- 15%Land available: 98 · 1.6% protected or public land
- 15%Hazard: 25 · FEMA risk index 75.3
Navarro County land availability and cost
Large parcels (100 acres or more), open land, land value per acre, protected land, floodplain, soil limits, brownfields, and water access for the county.
Land cover
Share of classified land, from the USDA Cropland Data Layer.
USDA CropScape, land cover by county · Public domainData centers in and near Navarro County
Operating data centers in the county and within 50 km, with their operators and distance from the county center.
| Facility | Operator | Distance | In county |
|---|---|---|---|
| Riot Corsiana | — | 12.7 km | Yes |
| Riot Corsicana | — | 12.7 km | Yes |
Mapped facilities are operating sites from the IM3 Atlas. Announced campuses not yet built come from Epoch AI and are not assigned to a county.
Navarro County natural hazard and permitting risk
FEMA hazard scores and disaster history, air-permitted data centers, local opposition, and ERCOT rule changes that apply to the county.
Hazard scores
FEMA hazard risk scores, shown as national percentiles rather than the probability of loss at a site.
Moratoriums, filings and opposition
No moratorium, ordinance, or opposition news names Navarro County in the last 30 days. Sources: GDELT news coverage. CEQA filings cover California only.
TX policy changes (statewide)
- 24 Sept 2026Voluntary community-impact RFI option for newly substantiated medium loads
- 21 Sept 2026RIOO RFI visibility restrictions and public question guides
- 14 Sept 2026State and Community Impact RFI issued
- 09 Sept 2026Batch Zero eligibility-verification RFIs issued
- 04 Sept 2026RIOO Off-cycle Release
Navarro County grid capacity and interconnection queue
Generation queued and operating in the county, transmission and gas access, power prices, and the TX-wide demand that new large loads compete with.
Generation mix
Operating capacity by energy source.
Transmission substations
Substations at the ends of 115 kV and higher lines, from HIFLD.
| Substation | kV | Owner |
|---|---|---|
| Big Brown | 345 | ONCOR ELECTRIC DELIVERY CO. |
Navarro County construction activity and data center jobs
Data processing and hosting businesses and jobs, and residential building permits as a measure of local construction activity.
Navarro County queue and demand charts
Queue in county by study stage
Active generation and storage, MW.
This county against the state median
Each figure as a multiple of the TX county median. 1.0 is typical.
Hourly demand profile (TX)
Average TX-wide demand by local hour over the last 14 days, MW.
eia-930-demand-profile · Nov 22, 2026Queued MW in this county by expected online year
Active generation and storage requests, by the year each expects to connect.
ercotqueue.com, interconnection queue projects · CC BY 4.0Sources for every Navarro County figure
| Figure | Value | As of | Source | License |
|---|---|---|---|---|
| Navarro County — 1 mapped data-centre facilities | 1 facilities | — | IM3 Data Center Atlas (PNNL) | ODbL 1.0 (IM3 Open Source Data Center Atlas, PNNL) |
| Navarro County — 11,717,820 sq ft of mapped data-centre footprint | 11,717,820 sq ft | — | IM3 Data Center Atlas (PNNL) | ODbL 1.0 (IM3 Open Source Data Center Atlas, PNNL) |
| Navarro County — 477 residential units permitted, 2025 | 477 permits | 01 Jan 2025 | Census Building Permits Survey — county (residential) | US federal work, public domain |
| Navarro County — $132,262,669 residential permit value, 2025 | 132,262,669 USD | 01 Jan 2025 | Census Building Permits Survey — county (residential) | US federal work, public domain |
| Navarro — 3 brownfield sites | 3 sites | — | EPA — brownfield sites by county | US federal work, public domain |
| 48349 — grassland 61.44% of classified land (2025) | 61.44 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48349 — forest 10.69% of classified land (2025) | 10.69 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48349 — water 7.06% of classified land (2025) | 7.06 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48349 — shrubland 0.34% of classified land (2025) | 0.34 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48349 — pasture hay 0.45% of classified land (2025) | 0.45 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48349 — wetlands 5.36% of classified land (2025) | 5.36 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48349 — cropland 7.21% of classified land (2025) | 7.21 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48349 — developed 7.12% of classified land (2025) | 7.12 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48349 — barren 0.32% of classified land (2025) | 0.32 % | 01 Jan 2025 | USDA CropScape — land cover by county | US federal work, public domain |
| 48349 — data-centre employment (2025): 0 | 0 jobs | 01 Jan 2025 | BLS QCEW — data-centre establishments and jobs by county | BLS Quarterly Census of Employment and Wages (US federal work, public domain) |
| 48349 — 0 data-centre establishments (2025) | 0 establishments | 01 Jan 2025 | BLS QCEW — data-centre establishments and jobs by county | BLS Quarterly Census of Employment and Wages (US federal work, public domain) |
| Navarro County — farmland $3,770 an acre (2022) | 3,770 USD per acre | 01 Jan 2022 | USDA Census of Agriculture — county land value and farm sizes | USDA NASS Census of Agriculture 2022 (US federal work, public domain) |
| Navarro County — 28.02% in FEMA's 1% annual-chance floodplain | 28.02 % | — | FEMA flood hazard areas — floodplain share | FEMA National Flood Hazard Layer (US federal work, public domain), served by Esri Living Atlas |
| Navarro County — 1,148 farms of 100+ acres (2022) | 1,148 farms | 01 Jan 2022 | USDA Census of Agriculture — county land value and farm sizes | USDA NASS Census of Agriculture 2022 (US federal work, public domain) |
| Navarro County — 1.6% protected or public land | 1.6 % | — | USGS PAD-US — protected and public land share | US federal work, public domain |
| Navarro — no material soil constraint | 7.1 % | — | NRCS SSURGO — soil constraints by county | US federal work, public domain |
| Navarro County — 6.86 km to nearest mapped river | 6.86 km | 01 Nov 2026 | USA Rivers and Streams (distance per county) | Esri Living Atlas, derived from USGS NHD (public domain) |
| Navarro County — 2.39 km to nearest natural-gas pipeline | 2.39 km | 01 Nov 2026 | EIA — natural gas pipelines (distance per county) | US federal work (EIA), public domain |
| Withdrawn: Hector Solar — Solar, 81.59 MW, Navarro | 81.59 MW | 01 Oct 2026 | ercotqueue.com — monthly queue changes | CC BY 4.0 — ercotqueue.com |
| Withdrawn: Hector Storage — Battery, 42.69 MW, Navarro | 42.69 MW | 01 Oct 2026 | ercotqueue.com — monthly queue changes | CC BY 4.0 — ercotqueue.com |
| Navarro County — 1 transmission substations (max 345 kV) | 1 substations | 01 Nov 2026 | HIFLD — transmission lines and substations | US federal work (HIFLD), public domain |
| Navarro County — 1.41 km to nearest 115 kV+ line | 1.41 km | 01 Nov 2026 | HIFLD — transmission lines and substations | US federal work (HIFLD), public domain |
| Oncor Electric Delivery Company LLC serves Navarro County | Oncor Electric Delivery Company LLC | 01 Jan 2025 | EIA-861 — utility service territory by county | US federal work, public domain |
| Navarro County Elec Coop, Inc serves Navarro County | Navarro County Elec Coop, Inc | 01 Jan 2025 | EIA-861 — utility service territory by county | US federal work, public domain |
| Navarro — expected annual loss $26.5m | 26,540,046.1 USD | — | FEMA National Risk Index | US federal work (FEMA), public domain |
| Navarro — NRI risk score 75.3 (Relatively Low) | 75.25 score | — | FEMA National Risk Index | US federal work (FEMA), public domain |
Derived figures — the band, readiness, studied share and comparisons — are CUDO derivations and say so wherever they appear.
Talk to us about Navarro County
Bring the site and the date. We will walk the evidence with you.