Live Oak County, TX data center site data

Time to power, land, grid capacity, and risk for Live Oak County, with a source and date for every figure.

Site summary

Live Oak County time to power and site score

An estimated time-to-power band and a weighted site score summarize the county’s power access, queue readiness, gas access, land, and hazards.

Estimated time-to-power band
4–7 yrs
Readiness
Filed: no study complete

Top risks

  1. Most queued capacity here is speculative: under a third has a completed study.
  2. Top natural hazards (FEMA NRI): hurricane, drought, heat wave.
Estimated site score, weighted
67/ 100
  • 35%Power access: 73 · max 138 kV substation; 1.9 km to a 115 kV+ line
  • 20%Queue readiness: 9 · 8.6% of queued MW has a completed study
  • 15%Gas access: 100 · 0.0 km to a gas pipeline
  • 15%Land available: 100 · 0.0% protected or public land
  • 15%Hazard: 66 · FEMA risk index 33.7
Land

Live Oak County land availability and cost

Large parcels (100 acres or more), open land, land value per acre, protected land, floodplain, soil limits, brownfields, and water access for the county.

Farms of 100+ acres
759farms
USDA Census of Agriculture, county land value and farm sizes · Jan 1, 2022 · Public domain · 202 of 1,000+ acres
Open (unbuilt) land
612,361acres
USDA CropScape, land cover by county · Public domain · 88.7% of the county
Farmland value per acre
$2,775per acre
USDA Census of Agriculture, county land value and farm sizes · Jan 1, 2022 · Public domain · agricultural land and buildings, 2022
Protected or public land
0%
Floodplain share
8.8%
Soil constraint
13% affected
NRCS SSURGO, soil constraints by county · Public domain · hydric 0.1% · shallow bedrock 13.2%
Brownfield sites
0sites
EPA, brownfield sites by county · Nov 1, 2026 · Public domain · none on the EPA register for this county
Distance to nearest river
1.1km
USA Rivers and Streams (distance per county) · Nov 1, 2026 · to nearest mapped river

Land cover

Share of classified land, from the USDA Cropland Data Layer.

shrubland64.79%
grassland20.63%
developed4.49%
forest2.65%
cropland2.52%
water2.14%
wetlands1.72%
barren0.74%
pasture hay0.32%
USDA CropScape, land cover by county · Public domain
Nearby data centers

Data centers in and near Live Oak County

Operating data centers in the county and within 50 km, with their operators and distance from the county center.

Mapped data centers in county
0
Data centers within 50 km
0
Straight-line distance from the county center
Mapped footprint
0sq ft
IM3 Data Center Atlas (PNNL) · Nov 23, 2026 · ODbL 1.0 · no mapped data centre in this county
Projected future locations (IM3 model)
0locations
IM3, projected data-centre locations · Nov 23, 2026 · ODbL 1.0 · none projected here — IM3 model output, not announcements

No mapped data centre within 50 km of the county centre.

Mapped facilities are operating sites from the IM3 Atlas. Announced campuses not yet built come from Epoch AI and are not assigned to a county.

Risk

Live Oak County natural hazard and permitting risk

FEMA hazard scores and disaster history, air-permitted data centers, local opposition, and ERCOT rule changes that apply to the county.

FEMA National Risk Index score
33.7score
FEMA National Risk Index · Public domain · Very Low
Expected annual loss
$7.3m
FEMA National Risk Index · Public domain
Disaster declarations since 2010
4
Air-permitted data centres
0facilities
none in this county · epa-echo-datacentre-air

Hazard scores

FEMA hazard risk scores, shown as national percentiles rather than the probability of loss at a site.

hurricane (Relatively Low)79
drought (Relatively Moderate)64
heat wave (Relatively Low)55
wildfire (Very Low)46
hail (Relatively Low)40
tornado (Relatively Low)39

Moratoriums, filings and opposition

No moratorium, ordinance, or opposition news names Live Oak County in the last 30 days. Sources: GDELT news coverage. CEQA filings cover California only.

TX policy changes (statewide)

  • 24 Sept 2026
    Voluntary community-impact RFI option for newly substantiated medium loads
  • 21 Sept 2026
    RIOO RFI visibility restrictions and public question guides
  • 14 Sept 2026
    State and Community Impact RFI issued
  • 09 Sept 2026
    Batch Zero eligibility-verification RFIs issued
  • 04 Sept 2026
    RIOO Off-cycle Release
Power

Live Oak County grid capacity and interconnection queue

Generation queued and operating in the county, transmission and gas access, power prices, and the TX-wide demand that new large loads compete with.

Generation and storage queue
582MW
Studied share of queue
50MW
8.6% of queued MW — derived from ISO status
Large-load queue (ERCOT, state total)
466.5GW
ercotqueue.com, ERCOT large-load funnel · Jun 18, 2026 · CC BY 4.0 · ERCOT publishes large loads for Texas as a whole; no public source names the county
Operating generation
—
Transmission substations
1substations
HIFLD, transmission lines and substations · Nov 1, 2026 · Public domain · max 138 kV
Distance to 115 kV+ line
1.9km
HIFLD, transmission lines and substations · Nov 1, 2026 · Public domain · from county centre
Distance to gas pipeline
0km
EIA, natural gas pipelines (distance per county) · Nov 1, 2026 · Public domain · for on-site generation
Industrial power price
72.1$/MWh
EIA, industrial retail electricity price · Aug 1, 2026 · Public domain · state average
Grid peak and annual demand (ERCOT)
91.1GW
eia-930-demand-profile · Nov 22, 2026 · peak hour, last 12 months · 509 TWh a year · ISO-wide, not this county
TX installed capacity above last year's peak
+96.1%
EIA, operating generator capacity by county · Aug 1, 2026 · Public domain · 178.6 GW installed vs 91.1 GW peak · firm only -4.2%
Queued MW per substation
582MW
ercotqueue.com, interconnection queue projects · CC BY 4.0 · 582 MW queued across 1 substations
Utilities serving the county
AEP Texas Central Company · Karnes Electric Coop Inc · Nueces Electric Cooperative · San Patricio Electric Coop Inc
Local economy

Live Oak County construction activity and data center jobs

Data processing and hosting businesses and jobs, and residential building permits as a measure of local construction activity.

Data processing and hosting locations
0establishments
Data processing and hosting jobs
0jobs
Residential units permitted
9permits
Census Building Permits Survey, county (residential) · Jan 1, 2025 · Public domain · Residential only; excludes data centers
Residential permit value
$2.3m
County map
Loading map…
Charts

Live Oak County queue and demand charts

Queue in county by study stage

Active generation and storage, MW.

0 MW101 MW201 MW302 MW402 MWFiledIn studyIA signed

This county against the state median

Each figure as a multiple of the TX county median. 1.0 is typical.

Generation queue MW0.42×
Studied share0.3×
Transmission substations1×
Km to 115 kV+0.86×
Km to gas pipeline0.01×

Hourly demand profile (TX)

Average TX-wide demand by local hour over the last 14 days, MW.

0 GW13 GW27 GW40 GW54 GW000102030405060708091011121314151617181920212223eia-930-demand-profile · Nov 22, 2026

Queued MW in this county by expected online year

Active generation and storage requests, by the year each expects to connect.

0 MW101 MW201 MW302 MW402 MW202620272030ercotqueue.com, interconnection queue projects · CC BY 4.0
Sources

Sources for every Live Oak County figure

FigureValueAs ofSourceLicense
Live Oak County — 9 residential units permitted, 20259 permits01 Jan 2025Census Building Permits Survey — county (residential)US federal work, public domain
Live Oak County — $2,330,031 residential permit value, 20252,330,031 USD01 Jan 2025Census Building Permits Survey — county (residential)US federal work, public domain
48297 — forest 2.65% of classified land (2025)2.65 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48297 — grassland 20.63% of classified land (2025)20.63 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48297 — pasture hay 0.32% of classified land (2025)0.32 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48297 — wetlands 1.72% of classified land (2025)1.72 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48297 — cropland 2.52% of classified land (2025)2.52 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48297 — water 2.14% of classified land (2025)2.14 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48297 — barren 0.74% of classified land (2025)0.74 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48297 — developed 4.49% of classified land (2025)4.49 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48297 — shrubland 64.79% of classified land (2025)64.79 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48297 — data-centre employment (2025): 00 jobs01 Jan 2025BLS QCEW — data-centre establishments and jobs by countyBLS Quarterly Census of Employment and Wages (US federal work, public domain)
48297 — 0 data-centre establishments (2025)0 establishments01 Jan 2025BLS QCEW — data-centre establishments and jobs by countyBLS Quarterly Census of Employment and Wages (US federal work, public domain)
Live Oak County — farmland $2,775 an acre (2022)2,775 USD per acre01 Jan 2022USDA Census of Agriculture — county land value and farm sizesUSDA NASS Census of Agriculture 2022 (US federal work, public domain)
Live Oak County — 8.82% in FEMA's 1% annual-chance floodplain8.82 %—FEMA flood hazard areas — floodplain shareFEMA National Flood Hazard Layer (US federal work, public domain), served by Esri Living Atlas
Live Oak County — 759 farms of 100+ acres (2022)759 farms01 Jan 2022USDA Census of Agriculture — county land value and farm sizesUSDA NASS Census of Agriculture 2022 (US federal work, public domain)
Live Oak County — 0.0% protected or public land0 %—USGS PAD-US — protected and public land shareUS federal work, public domain
Live Oak — shallow bedrock 13.2%13.2 %—NRCS SSURGO — soil constraints by countyUS federal work, public domain
Live Oak County — 1.1 km to nearest mapped river1.1 km01 Nov 2026USA Rivers and Streams (distance per county)Esri Living Atlas, derived from USGS NHD (public domain)
Live Oak County — 0.03 km to nearest natural-gas pipeline0.03 km01 Nov 2026EIA — natural gas pipelines (distance per county)US federal work (EIA), public domain
New entry: Lonestar Dawn Storage — Battery, 200.57 MW, Live Oak200.57 MW01 Oct 2026ercotqueue.com — monthly queue changesCC BY 4.0 — ercotqueue.com
Withdrawn: Buck Ranch Storage SLF — Battery, 40.8 MW, Live Oak40.8 MW01 Oct 2026ercotqueue.com — monthly queue changesCC BY 4.0 — ercotqueue.com
Withdrawn: Buck Ranch Solar SLF — Solar, 40.8 MW, Live Oak40.8 MW01 Oct 2026ercotqueue.com — monthly queue changesCC BY 4.0 — ercotqueue.com
New entry: Lonestar Sun Solar — Solar, 200.9 MW, Live Oak200.9 MW01 Oct 2026ercotqueue.com — monthly queue changesCC BY 4.0 — ercotqueue.com
Live Oak County — 1 transmission substations (max 138 kV)1 substations01 Nov 2026HIFLD — transmission lines and substationsUS federal work (HIFLD), public domain
Live Oak County — 1.86 km to nearest 115 kV+ line1.86 km01 Nov 2026HIFLD — transmission lines and substationsUS federal work (HIFLD), public domain
Nueces Electric Cooperative serves Live Oak CountyNueces Electric Cooperative01 Jan 2025EIA-861 — utility service territory by countyUS federal work, public domain
AEP Texas Central Company serves Live Oak CountyAEP Texas Central Company01 Jan 2025EIA-861 — utility service territory by countyUS federal work, public domain
San Patricio Electric Coop Inc serves Live Oak CountySan Patricio Electric Coop Inc01 Jan 2025EIA-861 — utility service territory by countyUS federal work, public domain
Karnes Electric Coop Inc serves Live Oak CountyKarnes Electric Coop Inc01 Jan 2025EIA-861 — utility service territory by countyUS federal work, public domain
Live Oak — expected annual loss $7.3m7,329,665.74 USD—FEMA National Risk IndexUS federal work (FEMA), public domain
Live Oak — NRI risk score 33.7 (Very Low)33.75 score—FEMA National Risk IndexUS federal work (FEMA), public domain

Derived figures — the band, readiness, studied share and comparisons — are CUDO derivations and say so wherever they appear.

Export and share

Talk to us about Live Oak County

Bring the site and the date. We will walk the evidence with you.

Start a conversation