Borden County, TX data center site data

Time to power, land, grid capacity, and risk for Borden County, with a source and date for every figure.

Site summary

Borden County time to power and site score

An estimated time-to-power band and a weighted site score summarize the county’s power access, queue readiness, gas access, land, and hazards.

Estimated time-to-power band
2–4 yrs
Readiness
Interconnection agreement signed

Top risks

  1. Top natural hazards (FEMA NRI): drought, wildfire, hail.
Estimated site score, weighted
76/ 100
  • 35%Power access: 74 · max 230 kV substation; 11.1 km to a 115 kV+ line
  • 20%Queue readiness: 67 · 67.2% of queued MW has a completed study
  • 15%Gas access: 53 · 23.5 km to a gas pipeline
  • 15%Land available: 100 · 0.0% protected or public land
  • 15%Hazard: 94 · FEMA risk index 5.7
Land

Borden County land availability and cost

Large parcels (100 acres or more), open land, land value per acre, protected land, floodplain, soil limits, brownfields, and water access for the county.

Farms of 100+ acres
163farms
USDA Census of Agriculture, county land value and farm sizes · Jan 1, 2022 · Public domain · 110 of 1,000+ acres
Open (unbuilt) land
557,274acres
USDA CropScape, land cover by county · Public domain · 96.1% of the county
Farmland value per acre
$1,141per acre
USDA Census of Agriculture, county land value and farm sizes · Jan 1, 2022 · Public domain · agricultural land and buildings, 2022
Protected or public land
0%
Floodplain share
0%
Soil constraint
31% affected
NRCS SSURGO, soil constraints by county · Public domain · hydric 0.4% · shallow bedrock 30.6%
Brownfield sites
0sites
EPA, brownfield sites by county · Nov 1, 2026 · Public domain · none on the EPA register for this county
Distance to nearest river
2km
USA Rivers and Streams (distance per county) · Nov 1, 2026 · to nearest mapped river

Land cover

Share of classified land, from the USDA Cropland Data Layer.

shrubland86.5%
cropland8.57%
developed1.76%
forest1.2%
barren1%
water0.53%
wetlands0.38%
grassland0.04%
pasture hay0.03%
USDA CropScape, land cover by county · Public domain
Nearby data centers

Data centers in and near Borden County

Operating data centers in the county and within 50 km, with their operators and distance from the county center.

Mapped data centers in county
0
Data centers within 50 km
0
Straight-line distance from the county center
Mapped footprint
0sq ft
IM3 Data Center Atlas (PNNL) · Nov 23, 2026 · ODbL 1.0 · no mapped data centre in this county
Projected future locations (IM3 model)
0locations
IM3, projected data-centre locations · Nov 23, 2026 · ODbL 1.0 · none projected here — IM3 model output, not announcements

No mapped data centre within 50 km of the county centre.

Mapped facilities are operating sites from the IM3 Atlas. Announced campuses not yet built come from Epoch AI and are not assigned to a county.

Risk

Borden County natural hazard and permitting risk

FEMA hazard scores and disaster history, air-permitted data centers, local opposition, and ERCOT rule changes that apply to the county.

FEMA National Risk Index score
5.7score
FEMA National Risk Index · Public domain · Very Low
Expected annual loss
$2.7m
FEMA National Risk Index · Public domain
Disaster declarations since 2010
2
Air-permitted data centres
0facilities
none in this county · epa-echo-datacentre-air

Hazard scores

FEMA hazard risk scores, shown as national percentiles rather than the probability of loss at a site.

drought (Relatively High)94
wildfire (Relatively Low)75
hail (Relatively Low)61
tornado (Very Low)11
strong wind (Very Low)11
hurricane (Very Low)11

Moratoriums, filings and opposition

No moratorium, ordinance, or opposition news names Borden County in the last 30 days. Sources: GDELT news coverage. CEQA filings cover California only.

TX policy changes (statewide)

  • 24 Sept 2026
    Voluntary community-impact RFI option for newly substantiated medium loads
  • 21 Sept 2026
    RIOO RFI visibility restrictions and public question guides
  • 14 Sept 2026
    State and Community Impact RFI issued
  • 09 Sept 2026
    Batch Zero eligibility-verification RFIs issued
  • 04 Sept 2026
    RIOO Off-cycle Release
Power

Borden County grid capacity and interconnection queue

Generation queued and operating in the county, transmission and gas access, power prices, and the TX-wide demand that new large loads compete with.

Generation and storage queue
5,557MW
Studied share of queue
3,737MW
67.2% of queued MW — derived from ISO status
Large-load queue (ERCOT, state total)
466.5GW
ercotqueue.com, ERCOT large-load funnel · Jun 18, 2026 · CC BY 4.0 · ERCOT publishes large loads for Texas as a whole; no public source names the county
Operating generation
2,957MW
Transmission substations
1substations
HIFLD, transmission lines and substations · Nov 1, 2026 · Public domain · max 230 kV
Distance to 115 kV+ line
11.1km
HIFLD, transmission lines and substations · Nov 1, 2026 · Public domain · from county centre
Distance to gas pipeline
23.5km
EIA, natural gas pipelines (distance per county) · Nov 1, 2026 · Public domain · for on-site generation
Industrial power price
72.1$/MWh
EIA, industrial retail electricity price · Aug 1, 2026 · Public domain · state average
Grid peak and annual demand (ERCOT)
91.1GW
eia-930-demand-profile · Nov 22, 2026 · peak hour, last 12 months · 509 TWh a year · ISO-wide, not this county
TX installed capacity above last year's peak
+96.1%
EIA, operating generator capacity by county · Aug 1, 2026 · Public domain · 178.6 GW installed vs 91.1 GW peak · firm only -4.2%
Queued MW per substation
5,557MW
ercotqueue.com, interconnection queue projects · CC BY 4.0 · 5,557 MW queued across 1 substations
Utilities serving the county
Big Country Electric Coop, Inc · Lyntegar Electric Coop, Inc · Oncor Electric Delivery Company LLC · Southwestern Public Service Co

Generation mix

Operating capacity by energy source.

WindSolarElectricity used for energy storage

Transmission substations

Substations at the ends of 115 kV and higher lines, from HIFLD.

SubstationkVOwner
Borden Co230LYNTEGAR ELECTRIC COOP, INC
Local economy

Borden County construction activity and data center jobs

Data processing and hosting businesses and jobs, and residential building permits as a measure of local construction activity.

Data processing and hosting locations
0establishments
Data processing and hosting jobs
Withheld
BLS QCEW, data-centre establishments and jobs by county · Public domain · BLS suppresses it where a few employers would be identifiable
Residential units permitted
0permits
Census Building Permits Survey, county (residential) · Nov 23, 2026 · Public domain · None reported. Residential only; excludes data centers
Residential permit value
$0
County map
Loading map…
Charts

Borden County queue and demand charts

Queue in county by study stage

Active generation and storage, MW.

0 MW934 MW1869 MW2803 MW3737 MWIn studyIA signed

This county against the state median

Each figure as a multiple of the TX county median. 1.0 is typical.

Generation queue MW3.99×
Studied share2.31×
Transmission substations1×
Km to 115 kV+5.11×
Km to gas pipeline8.26×

Hourly demand profile (TX)

Average TX-wide demand by local hour over the last 14 days, MW.

0 GW13 GW27 GW40 GW54 GW000102030405060708091011121314151617181920212223eia-930-demand-profile · Nov 22, 2026

Queued MW in this county by expected online year

Active generation and storage requests, by the year each expects to connect.

0 MW504 MW1009 MW1513 MW2017 MW2026202720282029ercotqueue.com, interconnection queue projects · CC BY 4.0
Sources

Sources for every Borden County figure

FigureValueAs ofSourceLicense
48033 — cropland 8.57% of classified land (2025)8.57 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48033 — grassland 0.04% of classified land (2025)0.04 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48033 — shrubland 86.5% of classified land (2025)86.5 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48033 — water 0.53% of classified land (2025)0.53 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48033 — barren 1.0% of classified land (2025)1 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48033 — wetlands 0.38% of classified land (2025)0.38 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48033 — forest 1.2% of classified land (2025)1.2 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48033 — developed 1.76% of classified land (2025)1.76 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48033 — pasture hay 0.03% of classified land (2025)0.03 %01 Jan 2025USDA CropScape — land cover by countyUS federal work, public domain
48033 — data-centre employment (2025) — suppressedsuppressed for confidentiality01 Jan 2025BLS QCEW — data-centre establishments and jobs by countyBLS Quarterly Census of Employment and Wages (US federal work, public domain)
48033 — 0 data-centre establishments (2025)0 establishments01 Jan 2025BLS QCEW — data-centre establishments and jobs by countyBLS Quarterly Census of Employment and Wages (US federal work, public domain)
Borden County — farmland $1,141 an acre (2022)1,141 USD per acre01 Jan 2022USDA Census of Agriculture — county land value and farm sizesUSDA NASS Census of Agriculture 2022 (US federal work, public domain)
Borden County — 0.0% in FEMA's 1% annual-chance floodplain0 %—FEMA flood hazard areas — floodplain shareFEMA National Flood Hazard Layer (US federal work, public domain), served by Esri Living Atlas
Borden County — 163 farms of 100+ acres (2022)163 farms01 Jan 2022USDA Census of Agriculture — county land value and farm sizesUSDA NASS Census of Agriculture 2022 (US federal work, public domain)
Borden County — 0.0% protected or public land0 %—USGS PAD-US — protected and public land shareUS federal work, public domain
Borden — shallow bedrock 30.6%30.6 %—NRCS SSURGO — soil constraints by countyUS federal work, public domain
Borden County — 2.0 km to nearest mapped river2 km01 Nov 2026USA Rivers and Streams (distance per county)Esri Living Atlas, derived from USGS NHD (public domain)
Borden County — 23.51 km to nearest natural-gas pipeline23.51 km01 Nov 2026EIA — natural gas pipelines (distance per county)US federal work (EIA), public domain
Interconnection agreement signed: Caesar Solar — Solar, 181.6 MW, Borden181.6 MW01 Sept 2026ercotqueue.com — monthly queue changesCC BY 4.0 — ercotqueue.com
Interconnection agreement signed: Caesar Storage — Battery, 205.5 MW, Borden205.5 MW01 Sept 2026ercotqueue.com — monthly queue changesCC BY 4.0 — ercotqueue.com
Borden County — 1 transmission substations (max 230 kV)1 substations01 Nov 2026HIFLD — transmission lines and substationsUS federal work (HIFLD), public domain
Borden County — 11.08 km to nearest 115 kV+ line11.08 km01 Nov 2026HIFLD — transmission lines and substationsUS federal work (HIFLD), public domain
Big Country Electric Coop, Inc serves Borden CountyBig Country Electric Coop, Inc01 Jan 2025EIA-861 — utility service territory by countyUS federal work, public domain
Lyntegar Electric Coop, Inc serves Borden CountyLyntegar Electric Coop, Inc01 Jan 2025EIA-861 — utility service territory by countyUS federal work, public domain
Oncor Electric Delivery Company LLC serves Borden CountyOncor Electric Delivery Company LLC01 Jan 2025EIA-861 — utility service territory by countyUS federal work, public domain
Southwestern Public Service Co serves Borden CountySouthwestern Public Service Co01 Jan 2025EIA-861 — utility service territory by countyUS federal work, public domain
Borden — expected annual loss $2.7m2,666,804.97 USD—FEMA National Risk IndexUS federal work (FEMA), public domain
Borden — NRI risk score 5.7 (Very Low)5.69 score—FEMA National Risk IndexUS federal work (FEMA), public domain

Derived figures — the band, readiness, studied share and comparisons — are CUDO derivations and say so wherever they appear.